Selected work

Problems solved, value delivered.

Real problems, solved in operating plants and on demanding machinery projects. Client and employer details are kept general where confidentiality applies.

Visibility & energy500+process variables across 16 assets on one SCADA

A plant that ran blind

Challenge
Production and energy data sat in isolated machines, leaving management without a reliable picture of output, downtime or cost.
Action
I designed the network, PLC logic and SCADA, adding web access, automated daily management reports and live gas and electricity monitoring.
Result
A business-critical system that improved efficiency and reduced downtime, and the data that made the next energy saving possible.
Energy50%reduction in natural gas use

Energy costs out of control

Challenge
Four presses drew hot water from a shared boiler, each needing constant operator attention while energy prices climbed.
Action
I analysed how the presses and boiler interacted, then designed, programmed and commissioned one PLC control system to coordinate them.
Result
Gas use cut by 50%, heat delivered to each press when needed, and an operator released for other work.
Investment case£5.9Msolar PV proposal, up to 52% of annual demand

An investment case without the evidence

Challenge
Rising energy costs and a site carbon target, with no engineering-led case for renewable investment.
Action
I analysed half-hourly consumption, modelled generation, assessed funding routes and wrote the business case.
Result
A proposal taken to the group board with the engineering evidence behind it.
Delivery & leadership17engineers led through full project lifecycles

High-value machines, demanding customers

Challenge
A machine builder delivering special purpose OEM machinery under tight commercial commitments and strict safety and compliance requirements.
Action
I led the engineering department, owning control architecture, functional safety and UKCA/CE compliance, introducing AI vision where it added value and giving hands-on PLC support when projects needed it.
Result
Repeatable, compliant delivery that met commitments, and a team working to one standard.
ReliabilityRoot causefound, fixed and written into procedure

A serious failure with an unknown cause

Challenge
A major lifting failure at a high-volume automotive plant. Nobody was hurt, but until the cause was known the risk remained.
Action
I led the safe recovery and risk assessment, then the investigation, including independent finite element analysis of the failed component.
Result
The cause was an incorrect maintenance procedure. A permanent fix was implemented and the procedure rewritten, removing the risk at source.
Reliability£1,000budget for a machine vision fix

An unreliable process, a small budget

Challenge
An array of optical sensors sorted vehicles to holding areas, but unreliably.
Action
I specified a machine vision system, secured the funding and commissioned it for £1,000.
Result
A simpler, more reliable process for minimal outlay. I later applied the same thinking at scale, with AI vision for robot pick and place and part quality inspection.
Earlier career

Highlights.

Umbilical manufacturing

Guidance on the PLC control sequence for one of the world's largest steel tube umbilical assembly machines, structured so maintenance engineers could fault-find it themselves.

Aerospace

Industrial ethernet, server and PLC support on site at a major aerospace manufacturer, with an isolated test server so updates carried no risk to production.

Capital projects

Specification to commissioning, from a £1,000 vision fix to a £600,000 robot measurement cell.

Facing one of these problems?

Tell me what is going on. I will tell you plainly whether I am the right person to help, and how I would approach it.